Roadmap Explained

Hardware / Motorization

PLUMRIDGE • INTEGRATION ROADMAPS

Roadmap Explained

Motorization terminology in plain English, for designers, clients and project teams.

From a Lutron button to a moving curtain

1. Specify the drapery and track

Confirm load, span, draw, bends, stacking and motor revision.

2. Confirm the Lutron control route

The integrator selects the supported interface and documents the command schedule.

3. Test a sample motor and track

Prove direction, stop behavior, limits and recovery using the intended controller.

4. Commission and record

Retain approved wiring, timings, addresses where applicable, and the final load and track specification.

Motor power, command wiring and track mechanics are separate parts of the roadmap. The sample proves that they work together.

What the wiring terms mean

TermPlain English
Dry contactAn isolated switch closure that sends a command. It does not power the motor.
NO / NCNormally open / normally closed: the contact’s resting state.
CommonThe shared return for control signals; not automatically mains neutral or earth.
CCI / CCOAn input receives a switch action; an output sends one.
Pulse / continuousA brief command versus a contact held while movement is required.
PinoutThe precise purpose of each connector terminal.
Stop logicThe particular contact action required to stop a motor. Forest and heavy-duty 475 differ.

Serial commands and feedback

TermWhat it means
RS485A wired serial motor bus. Commands are addressed messages rather than simple switch closures.
QS linkLutron’s system link; it is separate from the Forest RS485 bus.
AddressAn individual motor’s name on a serial bus.
GatewayA controller programmed to translate between control systems and motor commands.
SceneA programmed action, such as opening the curtains for a presentation.
FeedbackA returned position or status. Sending a command alone does not prove movement.
RF bridgeA radio control route that needs project-specific compatibility checks.

Why the track specification matters

Hanging weight is the actual fabric, lining and heading load. Span is the track length. Draw describes one-way or center opening. Radius describes a bend. Stacking is the space the open curtain occupies. Double tracks require checked spacing, motor placement and clearance.

Who does what?

Plumridge specifies fabrication, track geometry, loads and sample hardware. The Lutron integrator confirms the system and interface, programs the commands and tests the behavior. Together we sign off the sample before the full installation.

For Roman shades, Plumridge can fabricate around the specified Lutron Roman shade kit after confirming its dimensions, lift arrangement and fabric requirements. Roller kits likewise need the correct tube, drive and finished specification.

Forest Technical RoadmapHeavy-Duty Technical RoadmapPrint this explanation